Homepage    Fabrication Scheduling
IST_24519_25282-计划

Fabrication Scheduling

  • Set up the processing priority and create the work packages according to the project requirements:
    (such as the material available and required on-site date, on-site installation sequence, etc.);

  • Create work package according to different disciplines (piping, structure, electrical & instruments, etc.);

  • Created work package based on different subcontractors (locations, workshops);

  • Each Assembly / Spool can be assigned to a specific team or worker